A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)
Answer : A, C
What are two key Nutanix value propositions? (Choose two)
Answer : A, D
In the event of a primary datacenter failure. a customer wants to power on virtual machines in a secondary datacenter with an RPO and RTO of no more than 15 minutes. Upon further discussions with the customer. the systems engineer (SE) finds that round trip latency between the 2 sites ca reach up to 6ms Which Nutanix feature should the SE recommend?
Answer : C
A prospective customer has a requirement for Data-at-Rest-Encryption for all their data Which two license options are available to address this requirement? (Choose two)
Answer : A, B
How long must data be 'write-cold' before Erasure Coding can begin optimization?
Answer : D
An existing customer wants to upgrade their non-AHV hypervisor to the most recent version. The customer needs confirm that the hypervisor is supported on their AOS version. Where on the Support Portal is this information located?
Answer : A
A systems engineer needs to size a new project that requires offsite backup using Veeam. The prospect requires an RPO of 24 hours, and the ability to restore from the past 7 days of backups. The prospect's data change rate is 1%. How should the SE configure the SE configure Sizer for this scenario? ????
Answer : A, B