Your test team is currently executing interoperability testing. Consider the following excerpt from the failure description of an interoperability defect report:
Connect external camera to a Windows Vista PC.
Start the camera application on the PC. Application starts normally and recognizes connected camer
a.
Attempt to download the recorded data from the camera.
Data does not download.
Attempt to download the data three times. Data will not down---load.
Based on this information alone, which of the problems described hereafter exists in this defect report?
[K4] 3 credits
Answer : B
A diamond retailer is introducing a new stock taking system. Each diamond is assigned a character that represents the colour. The valid domain for the character ranges from D to Z. The colour is then graded using the following scale:
Which of the following test sets will provide the best equivalence partitioning coverage?
[K3] 2 credits
Answer : C
As a test analyst you are involved in the early stages of an acceptance test for a Product Data Management system. You are asked to write test designs and test cases based on use cases. An early version of the system is also already available. It is a known fact that on the implementation level many things will change (including the user-interface). The tests will be carried by end-users with much domain knowledge who have also been involved in the project defining the user requirements and reviewing documentation.
What is the BEST option regarding the level of detail and documentation required for test cases in the project?
[K4] 3 credits
Answer : D
Using the state diagram (based on the ''Route Calculation''), how many test cases are needed to achieve 1-switch coverage?
[K3] 3 credits
Answer : D
How many invalid test cases can be identified from the ''Route Calculation'' state table provided?
You may assume all actions are different and independent.
[K3] 3 credits
Answer : A
Study the ''Supercar'' classification tree, which of the following statements is correct?
[K3] 2 credits
Answer : B
Which of the following is a type of testing that someone in the role of a test analyst, working with the test manager, should typically consider and plan for?
[K2] 1 credit
Answer : C