Question 1

A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.

What needs to be performed next?



Answer : A


Question 2

Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers



Answer : A, B


Question 3

Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.

What should you do next?



Answer : D


Question 4

One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.

What are two requirements to separate the I/Os of the servers? (Choose two.)



Answer : A, B


Question 5

What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?



Answer : B


Question 6

What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?



Answer : B


Question 7

Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)



Answer : A, D