Question 1

Refer to the exhibit.

This image shows the workings of which type of microphone?



Answer : B

The image shows a dynamic microphone, which works through electromagnetic induction. In a dynamic microphone, sound waves cause the diaphragm to move, which in turn moves a coil of wire within the magnetic field of a magnet. This movement generates an electrical signal that corresponds to the sound. The visible components, such as the diaphragm, coil, and magnet, are characteristic of a dynamic microphone's internal structure.

CTS Technology Specialist Reference The CTS curriculum details the workings of various microphone types, explaining that dynamic microphones are durable and suitable for live sound due to their ability to handle high sound pressure levels.


Question 2

Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?



Answer : A

A static IP address is a fixed IP address that is manually assigned and does not change. This scheme is suitable for devices that require a constant address, allowing them to be easily located and accessed within a network. Static IP addresses are commonly used for routers, servers, and other essential devices in AV networks.

CTS Technology Specialist Reference The CTS curriculum covers IP addressing schemes, noting that static IP addresses provide reliability and are preferred for AV equipment requiring stable and consistent network access.


Question 3

During a site survey, a sound pressure level (SPL) meter can be used for measuring



Answer : B

An SPL (Sound Pressure Level) meter is commonly used during a site survey to measure the ambient noise level in a room. This measurement provides a baseline for audio system design, ensuring that the sound reinforcement system can deliver adequate volume levels above the background noise.

CTS Technology Specialist Reference According to CTS materials, assessing ambient noise levels with an SPL meter is a standard step in designing sound systems, especially in environments where speech intelligibility is critical.


Question 4

During the needs analysis stage, it is MOST IMPORTANT to determine the client's



Answer : B

During the needs analysis stage, understanding the client's application is critical, as it defines how the AV system will be used. This information guides the design to ensure the system meets the functional requirements for the specific use case, such as conferencing, presentations, or entertainment.

CTS Technology Specialist Reference The CTS guidelines on needs analysis emphasize determining the application as a foundation for tailoring the AV solution to fit client-specific operational needs and goals.


Question 5

A remote monitoring system's PRIMARY benefit is that it



Answer : A

The primary benefit of a remote monitoring system is that it reduces the need for service calls by allowing technicians to monitor equipment status, detect issues early, and perform diagnostics remotely. This proactive monitoring minimizes downtime and often resolves issues without the need for on-site intervention.

CTS Technology Specialist Reference CTS training emphasizes the value of remote monitoring in AV maintenance, highlighting its role in reducing service costs and improving system uptime by enabling early issue detection and resolution.


Question 6

A client wants a third-party commitment that a project will be completed as per contract and protection against losses if it is not. What document should they request from their supplier?



Answer : B

A performance bond provides a third-party guarantee that the contractor will complete the project as specified in the contract and offers protection against financial losses if the project is not completed. This bond ensures that the client has recourse if the contractor fails to meet contractual obligations.

CTS Technology Specialist Reference CTS study materials note that performance bonds are commonly requested in construction and large AV projects to provide clients with financial protection and assurance of project completion.


Question 7

A client requests for a project to be completed earlier than initially scheduled. What should the AV contractor do FIRST to address this change?



Answer : C

When a client requests an earlier project completion date, the AV contractor should first issue a Request for Change (RFC). This formal request documents the proposed schedule change and requires client approval. It allows for assessment of resource requirements, timeline adjustments, and any potential cost implications.

CTS Technology Specialist Reference The CTS guidelines stress documenting changes through formal requests like RFCs to ensure client approval and clarity on any impact to the project.